1988 Government of St. Lucia
Driving 40 16” steel tube piles and building a 20’ wide 
concrete jetty.

1998 Government of Barbados
Driving 67 12” steel tube piles at Speightstown and constructing 
a 12ft wide concrete jetty.

1991 D.C.P. Dominica
Driving 40 steel piles and casting concrete deck for container handling jetty.

1993 Government of Dominica
Constructing steel piled concrete fishing jetties at 3 locations
Salisbury, Bioche and Capuchin.

2000 Government of Barbados Conset Bay
Driving 10 16” concrete piles and rebuilding existing jetty.

2001 Union Island Coast Guard Base
Dredging of 5000 M cubed of sand to create causeway and dredged to accommodate the driving of 46 steel piles for jetty construction by US Navy UCT division.

2001 Mayreau Jetty Extension
Drove 40 concrete piles and constructing extension to Port 
Dock and cast concrete deck.

2002 Boatyard Jetty
Drove 46 steel tubes for the construction of 10 ft wide by 370 ft long recreational jetty in Barbados.

2003 Grenville Fisheries Jetty
Drove 48 steel piles and placed pre-cast caps and slabs for 
TOA corporation. 


2003-04 Doubloon International
Designed and built 200 meters of dock and finger piers in Marigot Bay, for the use of Moorings In. 

2004 The Harbour Rodney Bay St Lucia
Drove 60 steel piles and cast concrete jetty and drove 180 meters of vinyl sheet piling.

2005-06 Anse Chastenet Hotel
Driving 46 steel piles and constructing 12 ft wide concrete jetty 300 feet long. 


Boatyard - Barbados Grenville - Grenada 
 
      Marigot -St Lucia Jetty Extension - Mayreau 
 
      Oistins - Barbados Coast Guard Base - Union 
   
 
Copyright © 2006 Marenco Ltd. all rights reserved. Site designed by Artie Photography.